Production Intelligence

Making production
dependencies visible

Making orders, production progress and dependencies easier to understand.

Design lead
Lorenzo Rogante
Design scope
Head of Design / Design Lead
Collaboration
Management and development team
Designed for
Production managers and specialised operators
CONTEXT

Production teams need to understand how a disruption travels through a plan. The connected view places suppliers, components, work centres and products in the same workspace, with a route from the overview to the affected order and part.

Reconstructed interface · Synthetic operational data
3D assembly created for this case study

Key decisions

  1. Relationships before lists

    The network makes dependencies visible across entities that otherwise sit in separate views.

  2. Impact beside the issue

    Affected orders and illustrative impact estimates remain next to the path under investigation.

  3. Context through detail

    The selected order and component remain connected while the team compares a possible response.

01 / DESIGN DECISION

Read the relationships behind an order

Suppliers, components, work centres and products share one connected view. The production manager can follow a dependency path instead of assembling the relationship from separate lists.

SUPPLIERS6COMPONENTS12WORK CENTRES4PRODUCTS3 S-02Precision MetalsS-04Motion ComponentsS-07Custom MachiningS-09Drive SystemsS-12Precision MachiningS-15Sensors & SealsC-101Extruded baseC-102Guide railsC-103CarriageC-104Drive-end bearing housingC-105Ball screwC-106Servo motorC-107Shaft couplingC-108Cover & fastenersC-109Seal kitC-110Terminal blockC-111Position sensorC-112Mounting plateAS-02Assembly cellQT-01Final testAS-03Compact assemblyQT-02Motion testLA-200Linear actuatorLA-100Compact actuatorRA-060Rotary module SUPPLIES → CONSUMED BY → ASSEMBLED / TESTED FOR
Connected information, preserved context
02 / DESIGN DECISION

Place the impact beside the issue

The investigation links a delivery issue to the affected component and order. Estimated delay and cost sit beside that path, connecting the alert to its operational consequences. The displayed figures are synthetic.

SUPPLIERS6COMPONENTS12WORK CENTRES4PRODUCTS3 S-02Precision MetalsS-04Motion ComponentsS-07Custom MachiningS-09Drive SystemsS-12Precision MachiningS-15Sensors & SealsC-101Extruded baseC-102Guide railsC-103CarriageC-104Drive-end bearing housingC-105Ball screwC-106Servo motorC-107Shaft couplingC-108Cover & fastenersC-109Seal kitC-110Terminal blockC-111Position sensorC-112Mounting plateAS-02Assembly cellQT-01Final testAS-03Compact assemblyQT-02Motion testLA-200Linear actuatorLA-100Compact actuatorRA-060Rotary module SUPPLIES → CONSUMED BY → ASSEMBLED / TESTED FOR
Connected information, preserved context
03 / DESIGN DECISION

Change scale without losing the order

The selected order remains visible as the product detail opens. An illustrative 3D assembly, created for this portfolio, connects the network view to a physical part without presenting it as a recording of the original application.

Original illustrative assembly · synthetic operational data
04 / DESIGN DECISION

Connect the part to its operational context

Selecting a component reveals its supplier, availability and cost. The assembly supports spatial understanding; the design decision is to keep that part connected to the production work that depends on it.

Original illustrative assembly · synthetic operational data
05 / DESIGN DECISION

Make the response and its conditions comparable

Delivery, additional cost and outstanding checks appear together when reviewing an alternative supplier. A possible response remains distinct from a confirmed resolution.

Current arrival19 OctS-07 / €48 per part
→
Indicative alternative12 OctS-12 / €276 incremental cost
Demonstrative response · requires human review
06 / DESIGN DECISION

Carry the context into the next action

Part, quantity, order reference and required date carry into the request. The team can review those details before proceeding. This reconstruction prepares a local draft; it does not contact a supplier or place an order.

MO-1048 / SUPPLY REQUEST

Request 12
replacement parts

C-104 · Revision B · Required 12 Oct
Drawing, material and delivery require confirmation.

Demonstrative response · requires human review
DELIVERY & PRESENTATION

The alert is only
the beginning

The design connects a production alert to an investigation and a possible response. The walkthrough preserves the affected order and part while the team reviews the available options.

This presentation demonstrates the design approach qualitatively. Operational figures are illustrative; they are not measured project outcomes.

Making production risks visible and actionable

A production problem rarely affects a single part of the operation. A disruption involving a component or supplier can change what can be produced, when work can be completed, and the potential financial consequences.

My work on Production Intelligence focused on making that chain understandable: helping factory teams move from an alert to an assessment of its impact and a possible response.

The challenge

Production Intelligence is used by people managing production in a factory, including production managers and specialised operators. The system communicates problems, estimates their impact on production and proposes ways to address them.

The interface needed to connect several layers of information: the issue itself, the production dependencies involved, the projected delay and economic impact, and the solution being suggested.

My design challenge was to make this information useful for an operational decision. A team needs enough context to understand why an issue matters and evaluate what to do next.

My role

As Head of Design / Design Lead at BackwellTech, I helped shape the product direction and took responsibility for its user experience and visual language. I designed the information architecture, interaction flows, interface, reusable components and prototypes, and worked with developers on the product experience.

The work covered the overall experience, including production monitoring and the relationships between suppliers, components, machines and products. Requirements were informed by management input and discussions with engineering.

A representative workflow

A production manager is notified of a problem that could affect scheduled work. The system communicates the expected production impact, including a possible delay and estimated financial loss.

The user examines the affected parts of the operation and the solution proposed by the system. One possible response is to prepare a request for alternative suppliers.

This is a representative scenario: an issue is surfaced, its consequences are assessed, and a potential next action is prepared. Preparing a supplier request does not establish that it has been sent or that a supplier can fulfil it; those steps need their own operational confirmation.

Three design decisions

1. Present alerts together with their consequences

I structured the experience around the relationship between a problem and its operational significance. The alert needs to lead into the affected production context and the estimated consequences.

Showing projected delay and financial impact together gives the team a basis for assessing urgency. These values are estimates of what may happen; the interface needs to keep that distinction clear when the user evaluates the situation.

The aim is to help a production manager understand which issue requires attention and why, without having to reconstruct the impact from separate pieces of information.

2. Make production dependencies understandable

Production decisions involve relationships between suppliers, components, machines and products. I worked on presenting these connections as part of the product experience so users could follow how a problem affects the wider operation.

The dependency context helps explain the connection between a specific issue and the work at risk. It supports questions such as which parts of production depend on an affected component and where the consequences may propagate.

This gives the manager context for evaluating an alert and comparing possible responses. The relationships should remain understandable as the user moves between the overall production picture and the affected part of the operation.

3. Give the analysis an actionable continuation

The product proposes solutions, including preparing a request to alternative suppliers. I connected problem detection and impact assessment with this next step in the experience.

A proposed action needs to be understood in relation to the issue it addresses. The interface should help the user evaluate the recommendation and follow the work needed to act on it.

This keeps the operational goal visible: understand the disruption, assess its consequences, and determine a suitable response. A proposed solution and a successfully resolved production problem remain different outcomes.

Outcome and next step

My work established the UX and visual foundation for a product used by production teams, bringing problem detection, dependency context, projected impact and proposed responses into a connected experience.

This case study documents that design contribution. Delay reduction and financial savings are not presented as measured results of the interface.

I would next evaluate whether production managers and specialised operators can understand why an alert matters, identify the affected work and assess the proposed next action. I would also examine whether the distinction between the current problem and its projected consequences remains clear.