Manufacturing Operations

Making production
dependencies visible

UX and interface design for a manufacturing workspace, connecting supplier issues with affected components, orders and production plans.

Design lead
Lorenzo Rogante
Design scope
Product direction · UX architecture · UI design
Collaboration
Management and development team
Designed for
Production managers and specialised operators
CONTEXT

Production teams need to understand how a disruption travels through a plan. The connected view places suppliers, components, work centres and products in the same workspace, with a route from the overview to the affected order and part.

Reconstructed interface · Synthetic operational data
3D assembly created for this case study

Key decisions

  1. Relationships before lists

    The network makes dependencies visible across entities that otherwise sit in separate views.

  2. Impact beside the issue

    Affected orders and illustrative impact estimates remain next to the path under investigation.

  3. Context through detail

    The selected order and component remain connected while the team compares a possible response.

01 / DESIGN DECISION

Read the relationships behind an order

Suppliers, components, work centres and products share one connected view. The production manager can follow a dependency path instead of assembling the relationship from separate lists.

SUPPLIERS6COMPONENTS12WORK CENTRES4PRODUCTS3 S-02Precision MetalsS-04Motion ComponentsS-07Custom MachiningS-09Drive SystemsS-12Precision MachiningS-15Sensors & SealsC-101Extruded baseC-102Guide railsC-103CarriageC-104Drive-end bearing housingC-105Ball screwC-106Servo motorC-107Shaft couplingC-108Cover & fastenersC-109Seal kitC-110Terminal blockC-111Position sensorC-112Mounting plateAS-02Assembly cellQT-01Final testAS-03Compact assemblyQT-02Motion testLA-200Linear actuatorLA-100Compact actuatorRA-060Rotary module SUPPLIES → CONSUMED BY → ASSEMBLED / TESTED FOR
Connected information, preserved context
02 / DESIGN DECISION

Place the impact beside the issue

The investigation links a delivery issue to the affected component and order. Estimated delay and cost sit beside that path, connecting the alert to its operational consequences. The displayed figures are synthetic.

SUPPLIERS6COMPONENTS12WORK CENTRES4PRODUCTS3 S-02Precision MetalsS-04Motion ComponentsS-07Custom MachiningS-09Drive SystemsS-12Precision MachiningS-15Sensors & SealsC-101Extruded baseC-102Guide railsC-103CarriageC-104Drive-end bearing housingC-105Ball screwC-106Servo motorC-107Shaft couplingC-108Cover & fastenersC-109Seal kitC-110Terminal blockC-111Position sensorC-112Mounting plateAS-02Assembly cellQT-01Final testAS-03Compact assemblyQT-02Motion testLA-200Linear actuatorLA-100Compact actuatorRA-060Rotary module SUPPLIES → CONSUMED BY → ASSEMBLED / TESTED FOR
Connected information, preserved context
03 / DESIGN DECISION

Change scale without losing the order

The selected order remains visible as the product detail opens. An illustrative 3D assembly, created for this portfolio, connects the network view to a physical part without presenting it as a recording of the original application.

Original illustrative assembly · synthetic operational data
04 / DESIGN DECISION

Connect the part to its operational context

Selecting a component reveals its supplier, availability and cost. The assembly supports spatial understanding; the design decision is to keep that part connected to the production work that depends on it.

Original illustrative assembly · synthetic operational data
05 / DESIGN DECISION

Make the response and its conditions comparable

Delivery, additional cost and outstanding checks appear together when reviewing an alternative supplier. A possible response remains distinct from a confirmed resolution.

Current arrival19 OctS-07 / €48 per part
→
Indicative alternative12 OctS-12 / €276 incremental cost
Demonstrative response · requires human review
06 / DESIGN DECISION

Carry the context into the next action

Part, quantity, order reference and required date carry into the request. The team can review those details before proceeding. This reconstruction prepares a local draft; it does not contact a supplier or place an order.

MO-1048 / SUPPLY REQUEST

Request 12
replacement parts

C-104 · Revision B · Required 12 Oct
Drawing, material and delivery require confirmation.

Demonstrative response · requires human review
DELIVERY & PRESENTATION

The alert is only
the beginning

The design connects a production alert to an investigation and a possible response. The walkthrough preserves the affected order and part while the team reviews the available options.

This presentation demonstrates the design approach qualitatively. Operational figures are illustrative; they are not measured project outcomes.